DTCI OPERATIONS
Stripe Project Estimate
PROJECT IDDRAFT
ProjectUnnamed project
Road type4 Lane Divided
Total stripe quantity0 LF
Project miles used0.00 mi
Planned duration0workdays
On-site hours0.00hours
Total crew clock0.00hours
Total labor0.0labor-hours
Hours by activity
| Activity | Hours |
|---|---|
| Activity total | 0.00 |
| Setup, refills & cleanup | 0.00 |
| Contingency (0%) | 0.00 |
Production-hour distribution
No production quantities entered.
Project and crew assumptions
- Equivalent lines
- 6
- Stripe passes
- 4
- Layout passes
- 2
- Layout method
- Scan
- Crew size
- 8
- Flextab pullers
- 6
- Pre-mark workers
- 8
- Scheduled shift
- 10 hrs
- Travel mode
- Daily Commute
- One-way drive
- 0 hrs
- Available on site/day
- 10.00 hrs
- Total travel
- 0.00 hrs
Production standards
- Stripe truck
- 4 mph
- Flextab removal
- 0.5 mph/worker
- Layout truck
- 5 mph
- Manual pre-mark
- 1 mph/worker
- Removal
- 4 mph
- Centerline rumble
- 2.5 mph
- Edgeline rumble
- 2 mph
- Concrete rumble
- 1.5 mph
- Arrow / Symbol
- 5 / 10 min
- Crossbuck / Crosswalk
- 45 / 30 min
- Gore layout / stripe
- 20 / 20 min
Entered specialty quantities
Arrows0Symbols0Crossbucks0Crosswalks0Gores0