← All field tools
STRIPE TIME STUDYFIELD OPERATIONS
Production standards

FIELD MEASUREMENT

Time each step.
Dial in the standard.

Start a task when work begins. Stop it when the crew finishes, then record the completed quantity.

01 / JOB DETAILSSAME JOB · MULTIPLE TASKS

Saved projects and completed runs are shared. Active or stopped timers stay on this device until each run is saved.

SAVED PROJECTS

Open a project

0 saved
Save a project above to reopen it here later.
02 / TASK TIMERS

Start, stop, save.

15 work types
Pull flextabsStandard: 0.50 mph per worker · Measured: — (0)
00:00:00
Stripe truckStandard: 4.00 mph · Measured: — (0)
00:00:00
Layout with scanStandard: 5.00 mph · Measured: — (0)
00:00:00
Layout without scanStandard: 1.00 mph walking · Measured: — (0)
00:00:00
Rumble strips · centerlineStandard: 2.50 mph · Measured: — (0)
00:00:00
Rumble strips · edgelineStandard: 2.00 mph · Measured: — (0)
00:00:00
Rumble strips · concreteStandard: 1.50 mph · Measured: — (0)
00:00:00
Stripe removalStandard: 4.00 mph · Measured: — (0)
00:00:00
ArrowsStandard: 5.00 min each · Measured: — (0)
00:00:00
SymbolsStandard: 10.00 min each · Measured: — (0)
00:00:00
CrossbucksStandard: 45.00 min each · Measured: — (0)
00:00:00
CrosswalksStandard: 30.00 min each · Measured: — (0)
00:00:00
Gores · stripeStandard: 20.00 min each · Measured: — (0)
00:00:00
Gores · layoutStandard: 20.00 min each · Measured: — (0)
00:00:00
OtherStandard: No standard · Measured: — (0)
00:00:00

One timer runs at a time. After stopping one task, you can start the next and save the stopped run when its quantity is ready. Flextab standard is per worker; measured pace is for the crew.

03 / RUN LOG

Recorded runs

0 total
Your first saved task will appear here.