FIELD MEASUREMENT
Time each step.
Dial in the standard.
Start a task when work begins. Stop it when the crew finishes, then record the completed quantity.
SAVED PROJECTS
Open a project
0 savedSave a project above to reopen it here later.
02 / TASK TIMERS
Start, stop, save.
15 work typesPull flextabsStandard: 0.50 mph per worker · Measured: — (0)
Stripe truckStandard: 4.00 mph · Measured: — (0)
Layout with scanStandard: 5.00 mph · Measured: — (0)
Layout without scanStandard: 1.00 mph walking · Measured: — (0)
Rumble strips · centerlineStandard: 2.50 mph · Measured: — (0)
Rumble strips · edgelineStandard: 2.00 mph · Measured: — (0)
Rumble strips · concreteStandard: 1.50 mph · Measured: — (0)
Stripe removalStandard: 4.00 mph · Measured: — (0)
ArrowsStandard: 5.00 min each · Measured: — (0)
SymbolsStandard: 10.00 min each · Measured: — (0)
CrossbucksStandard: 45.00 min each · Measured: — (0)
CrosswalksStandard: 30.00 min each · Measured: — (0)
Gores · stripeStandard: 20.00 min each · Measured: — (0)
Gores · layoutStandard: 20.00 min each · Measured: — (0)
OtherStandard: No standard · Measured: — (0)
One timer runs at a time. After stopping one task, you can start the next and save the stopped run when its quantity is ready. Flextab standard is per worker; measured pace is for the crew.
03 / RUN LOG
Recorded runs
0 totalYour first saved task will appear here.